{"id":10482,"date":"2026-04-06T10:00:08","date_gmt":"2026-04-06T02:00:08","guid":{"rendered":"https:\/\/www.cncmachiningshops.com\/?p=10482"},"modified":"2026-07-19T11:23:31","modified_gmt":"2026-07-19T03:23:31","slug":"first-article-inspection","status":"publish","type":"post","link":"https:\/\/www.cncmachiningshops.com\/tr\/first-article-inspection\/","title":{"rendered":"\u0130lk Numune Muayenesi (FAI): Tan\u0131m, S\u00fcre\u00e7, Rapor \u015eablonlar\u0131 ve Sekt\u00f6r Standartlar\u0131"},"content":{"rendered":"<div data-page-id=\"Ts4idk9lHoMv7txL834cCwSwnLb\" data-lark-html-role=\"root\" data-docx-has-block-data=\"true\">\n<p>A dimensional error caught during first article inspection costs a few hours to fix. The same error found after 500 parts have shipped costs weeks of rework, a customer escalation, and possibly a lost program. We&#8217;ve seen both scenarios \u2014 and the difference always comes down to whether FAI was treated as a real engineering checkpoint or rushed through as paperwork.<\/p>\n<p>This article provides a practical, end-to-end guide to first article inspection. We cover what FAI is, when it&#8217;s required, how to execute the process step by step, how to complete AS9102-compliant reports, which measurement tools to use, how FAI requirements differ across aerospace, automotive, and medical industries, and the most common mistakes that cause rejections. Whether you&#8217;re a quality engineer preparing your first FAIR, a supplier trying to pass customer approval on the first attempt, or a buyer evaluating supplier readiness, the goal is to help you get FAI right \u2014 cleanly and without repeat cycles.<\/p>\n<h2>What Is First Article Inspection (FAI)?<\/h2>\n<h3>Formal Definition<\/h3>\n<p>First article inspection is a structured quality verification process that confirms a manufacturing process can produce a part fully conforming to all engineering requirements \u2014 dimensions, tolerances, materials, finishes, and special characteristics \u2014 before serial production begins.<\/p>\n<p>Formally, FAI requires complete inspection and documentation of the first production part made using intended production conditions: approved material, CNC programs, tooling, fixtures, and operators. This distinction matters. FAI is not a &#8220;first piece check&#8221; (which verifies only a few critical dimensions) or routine sampling inspection (which monitors ongoing production). Instead, first article inspection is comprehensive and documented, covering every drawing requirement and serving as objective evidence of compliance.<\/p>\n<h3>What Does FAI Actually Accomplish?<\/h3>\n<p>The purpose goes well beyond dimensional measurement:<\/p>\n<p><strong>Verify design manufacturability.<\/strong> FAI confirms that the drawing can actually be manufactured as specified \u2014 exposing hidden ambiguities, unrealistic tolerances, or missing callouts before they become batch problems.<\/p>\n<p><strong>Validate process stability.<\/strong> By using production-intent methods, FAI demonstrates that the process is capable, not just the individual part. This is especially important for CNC-machined components where tool wear, thermal drift, and fixture repeatability all affect output.<\/p>\n<p><strong>Demonstrate supplier capability.<\/strong> For customers, a compliant FAI report is proof that a supplier understands the requirements and can execute reliably. It forms the basis for production approval and, in many programs, is a prerequisite for payment.<\/p>\n<p>In essence, first article inspection is a design and process validation checkpoint. It catches issues when correction costs are lowest \u2014 before volume production begins.<\/p>\n<h2>When Is First Article Inspection Required?<\/h2>\n<p>FAI is required whenever there&#8217;s risk that a part may no longer conform to design intent or a process may no longer be capable. Customers use it as an objective reset point before approving production.<\/p>\n<h3>New Product Introduction (NPI)<\/h3>\n<p>FAI is mandatory for new parts, new drawings, or first-time production. Before any volume shipment, the first production article must pass full inspection to verify that drawings, specifications, tooling, CNC programs, and inspection methods are correctly aligned. This initial FAI establishes the baseline reference for all future production.<\/p>\n<h3>Design, Material, or Process Changes<\/h3>\n<p>Any change affecting form, fit, function, or quality typically triggers a new or partial FAI. Common triggers include revised dimensions or GD&amp;T, material grade or supplier changes, new CNC programs, different tooling or fixtures, and updated inspection methods. Even when the part looks identical, customers often require FAI evidence that the updated configuration still meets all requirements.<\/p>\n<h3>Supplier Change or Production Restart<\/h3>\n<p>New suppliers must demonstrate capability through FAI. Similarly, production restarts after extended downtime may involve different machines, operators, or setups. FAI confirms that capability has been re-established and no drift occurred during the gap.<\/p>\n<table>\n<thead>\n<tr>\n<th>Trigger Condition<\/th>\n<th>FAI Required?<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>New part \/ new drawing<\/td>\n<td>Yes<\/td>\n<\/tr>\n<tr>\n<td>First production run<\/td>\n<td>Yes<\/td>\n<\/tr>\n<tr>\n<td>Design or drawing revision<\/td>\n<td>Yes (full or partial)<\/td>\n<\/tr>\n<tr>\n<td>Material or process change<\/td>\n<td>Yes (affected features)<\/td>\n<\/tr>\n<tr>\n<td>New supplier or location<\/td>\n<td>Yes<\/td>\n<\/tr>\n<tr>\n<td>Long production pause, then restart<\/td>\n<td>Yes<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Understanding these triggers upfront helps manufacturers plan FAI proactively \u2014 avoiding surprises at shipment or audit time.<\/p>\n<h2>How Does the First Article Inspection Process Work?<\/h2>\n<p>A robust FAI process verifies not just a part, but the production system behind it. Here&#8217;s the step-by-step approach that consistently achieves first-pass customer approval in our experience.<\/p>\n<h3>Step 1: Review Engineering Drawings and Specifications<\/h3>\n<p>Start with a thorough review of drawings, notes, GD&amp;T per ASME Y14.5 or ISO 1101, and referenced standards. Identify all measurable characteristics and Critical-to-Quality (CTQ) features affecting form, fit, function, safety, or regulatory compliance. Balloon the drawing so every requirement gets a unique number \u2014 this becomes the backbone of your inspection plan and FAIR report.<\/p>\n<h3>Step 2: Produce the First Article Under Production Conditions<\/h3>\n<p>The &#8220;first article&#8221; must come from production-intent conditions: approved material, final CNC programs, production tooling and fixtures, and qualified operators. It cannot be a prototype or trial piece. FAI validates repeatability, so any deviation \u2014 temporary tools, manual adjustments, different machine \u2014 undermines the approval&#8217;s validity.<\/p>\n<h3>Step 3: Perform Full Dimensional and Visual Inspection<\/h3>\n<p>Execute 100% dimensional inspection against the ballooned drawing. Use calibrated tools matched to tolerance requirements: calipers for general dimensions, micrometers for critical fits, and CMM for complex GD&amp;T features like true position, profile, and flatness. Record actual measured values \u2014 not just pass\/fail. Additionally, conduct visual and surface checks for burrs, edge breaks, coating coverage, and any cosmetic criteria specified by the customer.<\/p>\n<h3>Step 4: Verify Materials and Special Processes<\/h3>\n<p>Confirm material compliance using raw material certifications (mill test reports) that match the drawing callout per material spec (e.g., AMS 4928 for Ti-6Al-4V, AMS-QQ-A-250 for aluminum alloys). Verify special processes \u2014 heat treatment, anodizing, plating, passivation \u2014 using process certifications from approved suppliers per Nadcap or customer-approved source lists. Ensure part IDs and batch numbers trace to certificates.<\/p>\n<h3>Step 5: Document Results and Submit the FAIR<\/h3>\n<p>Compile all results into a First Article Inspection Report. Each ballooned characteristic must link to a measured result and inspection method. Note any deviations and corrective actions clearly. Submit the FAIR with supporting documents for customer review. Approval authorizes production release; rejection triggers correction and re-inspection of affected features.<\/p>\n<p><strong>FAI flow summary:<\/strong> Drawing review \u2192 Ballooning \u2192 First production part \u2192 Full inspection \u2192 Material\/process verification \u2192 FAIR submission \u2192 Customer approval<\/p>\n<h2>What Is a First Article Inspection Report (FAIR)?<\/h2>\n<p>A FAIR is the formal, traceable record proving that a first production part meets every engineering requirement. Customers review it to decide whether production can proceed. A complete, well-structured FAIR shortens review cycles and prevents avoidable rejections.<\/p>\n<h3>Required FAIR Content<\/h3>\n<p>A compliant FAIR links design intent to inspection evidence to objective results. At minimum, include:<\/p>\n<ul>\n<li><strong>Part information:<\/strong> Part number, revision, description, serial\/lot number, manufacturing location, inspection date<\/li>\n<li><strong>Drawing characteristics:<\/strong> Every dimension, tolerance, GD&amp;T requirement, note, and special characteristic \u2014 referenced via ballooned drawing<\/li>\n<li><strong>Measurement results:<\/strong> Actual measured values (not pass\/fail only), inspection tool used, and inspector identification<\/li>\n<li><strong>Conformance status:<\/strong> Clear indication of conformity or nonconformance, with documented corrective actions where applicable<\/li>\n<\/ul>\n<p>Based on our production data, incomplete linkage \u2014 missing measurements, unclear traceability, or balloon-to-report mismatches \u2014 accounts for roughly 40% of FAIR rejections we see, even when the part itself is physically acceptable.<\/p>\n<h3>AS9102 Forms 1, 2, and 3<\/h3>\n<p>In aerospace and many high-reliability industries, FAIRs follow AS9102:<\/p>\n<p><strong>Form 1 \u2014 Part Number Accountability.<\/strong> Captures part\/assembly identification, revision status, and baseline configuration. This confirms exactly which part the inspection covers.<\/p>\n<p><strong>Form 2 \u2014 Product Accountability.<\/strong> Documents raw materials and special processes (heat treatment, anodizing, plating), including certification references and approved sources.<\/p>\n<p><strong>Form 3 \u2014 Characteristic Accountability.<\/strong> Lists each ballooned characteristic with its requirement, actual measurement, inspection method, and result. This is the core compliance evidence.<\/p>\n<p>Together, the three forms establish full accountability from material input through dimensional output.<\/p>\n<h3>Ballooned Drawings: Best Practices<\/h3>\n<p>Ballooned drawings assign a unique number to every inspectable characteristic, creating a direct link between drawing and Form 3.<\/p>\n<p><strong>Do:<\/strong> Number every requirement including notes and GD&amp;T frames. Keep numbering sequential and unambiguous. Match balloon numbers exactly to Form 3 entries.<\/p>\n<p><strong>Don&#8217;t:<\/strong> Skip surface or note callouts. Reuse numbers across features. Create balloons that don&#8217;t clearly point to the controlled feature.<\/p>\n<p>In our experience, a clean ballooned drawing is often the difference between same-day approval and multiple revision cycles.<\/p>\n<h2>What Measurement Tools Are Used in FAI?<\/h2>\n<p>Accurate first article inspection requires tools matched to tolerance requirements and inspection intent. The goal is generating traceable, repeatable evidence that withstands customer and audit review.<\/p>\n<h3>Conventional Inspection Tools<\/h3>\n<p><strong>Calipers<\/strong> handle general dimensions with moderate tolerances \u2014 fast and flexible but limited in accuracy for tight fits.<\/p>\n<p><strong>Micrometers<\/strong> provide higher precision for critical diameters, thicknesses, and widths, especially where tolerances run \u00b10.01\u20130.02 mm.<\/p>\n<p><strong>Gauges<\/strong> (pin gauges, thread gauges, go\/no-go gauges) verify holes and threads quickly. However, they should supplement variable measurements in FAI \u2014 not replace them.<\/p>\n<p><strong>CMMs (Coordinate Measuring Machines)<\/strong> are essential for complex geometry and GD&amp;T features. CMM inspection accurately measures true position, profile, flatness, and coaxiality, producing digital outputs that integrate directly into FAIR documentation.<\/p>\n<h3>Advanced Digital Methods<\/h3>\n<p><strong>3D scanning<\/strong> captures dense point clouds useful for freeform surfaces, castings, and additive-manufactured parts. While not always a CMM replacement, it excels at deviation visualization and surface coverage.<\/p>\n<p><strong>Model-Based Definition (MBD) inspection<\/strong> uses the 3D CAD model as the authoritative source instead of 2D drawings. Software compares measured data directly to the model, reducing interpretation errors and improving clarity.<\/p>\n<p><strong>Key principle:<\/strong> Match tool resolution to tolerance. A \u00b10.05 mm tolerance doesn&#8217;t need a CMM; a true position callout of \u00b10.02 mm does. Over-measuring wastes time, while under-measuring creates risk.<\/p>\n<h2>How Does First Article Inspection Differ Across Industries?<\/h2>\n<p>The core FAI objective stays consistent \u2014 verify that a product meets design requirements. However, depth, format, and acceptance criteria vary significantly by industry.<\/p>\n<h3>Aerospace: AS9102<\/h3>\n<p>Aerospace FAI follows AS9102 and is typically non-negotiable. Customers often require both part-level and assembly-level FAIs. Every drawing characteristic, note, and special process must link to a ballooned number, a measured result, and full traceability to material lots, process certifications, and calibration records. Any design or process change triggers partial or full re-FAI.<\/p>\n<h3>Automotive: FAI vs. PPAP<\/h3>\n<p>In automotive manufacturing, FAI exists but is often embedded within PPAP (Production Part Approval Process). Dimensional inspection supports PPAP but combines with process flow diagrams, control plans, PFMEA, and capability studies (Cp\/Cpk).<\/p>\n<p>The key difference: FAI verifies the first production part. PPAP validates the entire production process and its long-term capability. FAI is common for prototypes, tooling tryouts, and low-volume programs. PPAP governs full-scale mass production.<\/p>\n<h3>Medical Devices: ISO 13485<\/h3>\n<p>Under ISO 13485, risk management and regulatory compliance drive FAI requirements rather than a fixed form. Inspection depth ties to patient safety and device function. Critical dimensions, materials, and processes receive heightened scrutiny. Documentation must support design history files (DHF) and device master records (DMR). Change control is especially strict \u2014 any modification affecting function or sterilization may require re-validation.<\/p>\n<table>\n<thead>\n<tr>\n<th>Industry<\/th>\n<th>Primary Standard<\/th>\n<th>FAI Focus<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Aerospace<\/td>\n<td>AS9102<\/td>\n<td>Full dimensional + full traceability<\/td>\n<\/tr>\n<tr>\n<td>Automotive<\/td>\n<td>PPAP (with FAI elements)<\/td>\n<td>Process capability + dimensional validation<\/td>\n<\/tr>\n<tr>\n<td>Medical<\/td>\n<td>ISO 13485<\/td>\n<td>Risk-based inspection and compliance<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Common FAI Non-Conformances and How to Prevent Them<\/h2>\n<p>First article inspection failures are rarely random. Most fall into a small number of repeatable patterns. In our quality team&#8217;s experience, addressing these root causes improves first-pass approval rates by 30\u201350%.<\/p>\n<p><strong>Dimensional out-of-tolerance results.<\/strong> Features exceed drawing limits due to incorrect CNC offsets, tool wear, thermal growth, or unrealistic tolerances. This is the most visible FAI rejection type.<\/p>\n<p><strong>Incomplete or incorrect documentation.<\/strong> Missing balloon numbers, unreported drawing notes, pass\/fail without actual values, or mismatches between drawing and report. These trigger rejection even when the part is physically acceptable.<\/p>\n<p><strong>Missing or invalid material\/process certifications.<\/strong> Absent mill test reports, expired heat treatment certificates, or unapproved special-process suppliers break traceability and invalidate the FAI.<\/p>\n<p><strong>Unverified special characteristics.<\/strong> CTQs or key characteristics not clearly identified, measured with inappropriate tools, or omitted entirely from the report.<\/p>\n<h3>Root Cause Categories and Fixes<\/h3>\n<p><strong>Design-related:<\/strong> Ambiguous drawings or over-tight tolerances require clarification with engineering. The fix may include drawing revision or tolerance reallocation.<\/p>\n<p><strong>Process-related:<\/strong> Tool deflection, fixture instability, or uncontrolled parameters indicate capability gaps. Actions include process adjustment, tooling upgrades, or intermediate inspection steps.<\/p>\n<p><strong>Measurement-related:<\/strong> Wrong method, insufficient resolution, or uncalibrated equipment can produce false failures. Conduct measurement system analysis (MSA) and match tools to tolerance.<\/p>\n<table>\n<thead>\n<tr>\n<th>Failure Type<\/th>\n<th>Preventive Action<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Dimensional errors<\/td>\n<td>Validate process capability before FAI<\/td>\n<\/tr>\n<tr>\n<td>Documentation gaps<\/td>\n<td>Use a standardized FAIR checklist<\/td>\n<\/tr>\n<tr>\n<td>Missing certificates<\/td>\n<td>Verify traceability before inspection begins<\/td>\n<\/tr>\n<tr>\n<td>Measurement errors<\/td>\n<td>Match tools to tolerance and GD&amp;T requirements<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>How FAI Fits into Your Quality Management System<\/h2>\n<p>Within a structured QMS, first article inspection functions as a formal control point linking design intent, manufacturing execution, and ongoing quality assurance.<\/p>\n<p>From an <strong>ISO 9001<\/strong> perspective, FAI supports requirements for production control, product conformity verification, and change management. ISO 9001 doesn&#8217;t mandate FAI by name, but FAI provides objective evidence that processes are capable before full production \u2014 directly aligning with risk-based thinking.<\/p>\n<p>In <strong>AS9100<\/strong> systems, AS9102 explicitly formalizes FAI as a mandatory quality gate. AS9100 treats FAI as a critical input to production approval.<\/p>\n<p>FAI also connects to broader quality tools. In automotive environments, FAI data feeds into APQP and PPAP \u2014 supporting control plans, capability studies, and long-term process validation. Issues found during FAI become inputs for corrective actions, PFMEA updates, and process optimization.<\/p>\n<p>Most importantly, FAI serves as a baseline for continuous improvement. Measurement data, deviations, and lessons learned inform future revisions, reduce variation, and strengthen process robustness over time.<\/p>\n<h2>Conclusion<\/h2>\n<p>First article inspection is the most critical quality validation step before volume production. It confirms \u2014 using production-intent methods \u2014 that design requirements, manufacturing processes, materials, and inspection systems are aligned and capable. Skipping or rushing FAI transforms early uncertainty into downstream risk: scrap, rework, customer escalations, and delayed launches.<\/p>\n<p>Organizations that treat FAI as an engineering and quality discipline \u2014 not a paperwork exercise \u2014 see measurable benefits: fewer reworks, shorter approval cycles, more stable production, and stronger customer relationships. Getting FAI right the first time is the fastest path to production approval. Need help preparing for first article inspection on your next CNC project? [Contact our quality engineering team] for FAI support, report preparation, and precision machining services.<\/p>\n<h2>FAQ<\/h2>\n<h3>Is first article inspection mandatory?<\/h3>\n<p>FAI isn&#8217;t universally required by law, but it&#8217;s contractually mandatory in many industries. Aerospace programs commonly require it per AS9102. Medical and industrial customers often specify FAI in purchase orders or quality agreements. Even when not explicitly required, FAI is widely recognized as best practice for production validation \u2014 and most serious buyers expect it.<\/p>\n<h3>Who is responsible for performing FAI?<\/h3>\n<p>The manufacturer or supplier producing the part is responsible for performing FAI and preparing the FAIR. In practice, responsibility is shared: design engineers provide clear drawings, quality engineers define inspection methods, and customers retain final approval authority. During audits, accountability always rests with the supplier.<\/p>\n<h3>How often should FAI be repeated?<\/h3>\n<p>FAI is performed for the first production run and repeated whenever a change affects form, fit, function, or quality. Common triggers include drawing revisions, material or process changes, supplier changes, and production restarts after extended downtime. Some customers also require periodic re-FAI for long-running programs \u2014 typically at intervals defined in the quality agreement.<\/p>\n<h3>What is the difference between FAI and PPAP?<\/h3>\n<p>FAI focuses on verifying the first production part against all design requirements through complete dimensional and documentation review. PPAP (used mainly in automotive) validates the entire production process \u2014 including process flow, control plans, PFMEA, and statistical capability studies. In short, FAI proves the part meets spec. PPAP proves the process can sustain that conformance at volume.<\/p>\n<h3>Can FAI results be partially reused after changes?<\/h3>\n<p>Yes. Many standards allow partial (delta) FAI when changes are limited in scope. Only affected characteristics need re-inspection and re-documentation, while unchanged features reference the previously approved FAI. Clear change identification and proper traceability are essential for customer acceptance of partial FAI submissions.<\/p>\n<p>&nbsp;<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>\u0130lk numune muayenesi (FAI) i\u00e7in eksiksiz k\u0131lavuz \u2014 ad\u0131m ad\u0131m s\u00fcreci, AS9102 rapor \u015fablonlar\u0131n\u0131, sekt\u00f6r standartlar\u0131n\u0131 ve FAI'yi ilk denemede nas\u0131l ge\u00e7ece\u011finizi kapsar.<\/p>","protected":false},"author":1,"featured_media":12134,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[104],"tags":[],"class_list":["post-10482","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-general-basics"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v26.5 (Yoast SEO v28.7) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>First Article Inspection: Process, Reports &amp; Standards<\/title>\n<meta name=\"description\" content=\"Complete guide to first article inspection (FAI) \u2014 covering the step-by-step process, AS9102 report templates, industry standards, and how to pass FAI on the first attempt.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.cncmachiningshops.com\/tr\/first-article-inspection\/\" \/>\n<meta property=\"og:locale\" content=\"tr_TR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"First Article Inspection (FAI): Definition, Process, Report Templates, and Industry Standards\" \/>\n<meta property=\"og:description\" content=\"Complete guide to first article inspection (FAI) \u2014 covering the step-by-step process, AS9102 report templates, industry standards, and how to pass FAI on the first attempt.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.cncmachiningshops.com\/tr\/first-article-inspection\/\" \/>\n<meta property=\"og:site_name\" content=\"CNC Machining Shops\" \/>\n<meta property=\"article:published_time\" content=\"2026-04-06T02:00:08+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-07-19T03:23:31+00:00\" \/>\n<meta name=\"author\" content=\"cncmachiningshops\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Yazan:\" \/>\n\t<meta name=\"twitter:data1\" content=\"cncmachiningshops\" \/>\n\t<meta name=\"twitter:label2\" content=\"Tahmini okuma s\u00fcresi\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 dakika\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/first-article-inspection\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/first-article-inspection\\\/\"},\"author\":{\"name\":\"cncmachiningshops\",\"@id\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/#\\\/schema\\\/person\\\/2593a2e2de68be71300e10f486236551\"},\"headline\":\"First Article Inspection (FAI): Definition, Process, Report Templates, and Industry Standards\",\"datePublished\":\"2026-04-06T02:00:08+00:00\",\"dateModified\":\"2026-07-19T03:23:31+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/first-article-inspection\\\/\"},\"wordCount\":2623,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/first-article-inspection\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/First-Article-Inspection-FAI-800x600-1.jpg\",\"articleSection\":[\"General Basics\"],\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.cncmachiningshops.com\\\/first-article-inspection\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/first-article-inspection\\\/\",\"url\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/first-article-inspection\\\/\",\"name\":\"First Article Inspection: Process, Reports & Standards\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/first-article-inspection\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/first-article-inspection\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/First-Article-Inspection-FAI-800x600-1.jpg\",\"datePublished\":\"2026-04-06T02:00:08+00:00\",\"dateModified\":\"2026-07-19T03:23:31+00:00\",\"description\":\"Complete guide to first article inspection (FAI) \u2014 covering the step-by-step process, AS9102 report templates, industry standards, and how to pass FAI on the first attempt.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/first-article-inspection\\\/#breadcrumb\"},\"inLanguage\":\"tr\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.cncmachiningshops.com\\\/first-article-inspection\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/first-article-inspection\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/First-Article-Inspection-FAI-800x600-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/wp-content\\\/uploads\\\/2026\\\/04\\\/First-Article-Inspection-FAI-800x600-1.jpg\",\"width\":800,\"height\":600,\"caption\":\"First Article Inspection (FAI) 800x600\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/first-article-inspection\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"First Article Inspection (FAI): Definition, Process, Report Templates, and Industry Standards\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/#website\",\"url\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/\",\"name\":\"CNC Machining Shops\",\"description\":\"10+ Years CNC Machining Service Supplier\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/#organization\"},\"alternateName\":\"CMS\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"tr\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/#organization\",\"name\":\"CNC Machining Shops\",\"alternateName\":\"CMS\",\"url\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/CMS_Logo_1000x1000.png\",\"contentUrl\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/wp-content\\\/uploads\\\/2025\\\/11\\\/CMS_Logo_1000x1000.png\",\"width\":800,\"height\":800,\"caption\":\"CNC Machining Shops\"},\"image\":{\"@id\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"description\":\"Shenzhen CMS Technology Co., Ltd. is located in Shenzhen, Guangdong, China. It was established in 2012 with a factory area of \u200b\u200b3,000 square meters. It is a company specializing in CNC machining and precision parts manufacturing. We have passed ISO9001, IATF16949, ISO13485 certification and are your trusted partner.\",\"email\":\"info@cncmachiningshops.com\",\"telephone\":\"+8617196430663\",\"legalName\":\"Shenzhen CMS Technology Co., Ltd.\",\"foundingDate\":\"2012-07-22\",\"numberOfEmployees\":{\"@type\":\"QuantitativeValue\",\"minValue\":\"11\",\"maxValue\":\"50\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.cncmachiningshops.com\\\/#\\\/schema\\\/person\\\/2593a2e2de68be71300e10f486236551\",\"name\":\"cncmachiningshops\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"tr\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/36a63d96ed08f8805561107422de4e83bbf8d1669dbc9655acab534bc3e1ed17?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/36a63d96ed08f8805561107422de4e83bbf8d1669dbc9655acab534bc3e1ed17?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/36a63d96ed08f8805561107422de4e83bbf8d1669dbc9655acab534bc3e1ed17?s=96&d=mm&r=g\",\"caption\":\"cncmachiningshops\"},\"sameAs\":[\"https:\\\/\\\/cncmachiningshops.com\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"\u0130lk Numune Muayenesi: S\u00fcre\u00e7, Raporlar ve Standartlar","description":"\u0130lk numune muayenesi (FAI) i\u00e7in eksiksiz k\u0131lavuz \u2014 ad\u0131m ad\u0131m s\u00fcreci, AS9102 rapor \u015fablonlar\u0131n\u0131, sekt\u00f6r standartlar\u0131n\u0131 ve FAI'yi ilk denemede nas\u0131l ge\u00e7ece\u011finizi kapsar.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.cncmachiningshops.com\/tr\/first-article-inspection\/","og_locale":"tr_TR","og_type":"article","og_title":"First Article Inspection (FAI): Definition, Process, Report Templates, and Industry Standards","og_description":"Complete guide to first article inspection (FAI) \u2014 covering the step-by-step process, AS9102 report templates, industry standards, and how to pass FAI on the first attempt.","og_url":"https:\/\/www.cncmachiningshops.com\/tr\/first-article-inspection\/","og_site_name":"CNC Machining Shops","article_published_time":"2026-04-06T02:00:08+00:00","article_modified_time":"2026-07-19T03:23:31+00:00","author":"cncmachiningshops","twitter_card":"summary_large_image","twitter_misc":{"Yazan:":"cncmachiningshops","Tahmini okuma s\u00fcresi":"12 dakika"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.cncmachiningshops.com\/first-article-inspection\/#article","isPartOf":{"@id":"https:\/\/www.cncmachiningshops.com\/first-article-inspection\/"},"author":{"name":"cncmachiningshops","@id":"https:\/\/www.cncmachiningshops.com\/#\/schema\/person\/2593a2e2de68be71300e10f486236551"},"headline":"First Article Inspection (FAI): Definition, Process, Report Templates, and Industry Standards","datePublished":"2026-04-06T02:00:08+00:00","dateModified":"2026-07-19T03:23:31+00:00","mainEntityOfPage":{"@id":"https:\/\/www.cncmachiningshops.com\/first-article-inspection\/"},"wordCount":2623,"commentCount":0,"publisher":{"@id":"https:\/\/www.cncmachiningshops.com\/#organization"},"image":{"@id":"https:\/\/www.cncmachiningshops.com\/first-article-inspection\/#primaryimage"},"thumbnailUrl":"https:\/\/www.cncmachiningshops.com\/wp-content\/uploads\/2026\/04\/First-Article-Inspection-FAI-800x600-1.jpg","articleSection":["General Basics"],"inLanguage":"tr","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.cncmachiningshops.com\/first-article-inspection\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.cncmachiningshops.com\/first-article-inspection\/","url":"https:\/\/www.cncmachiningshops.com\/first-article-inspection\/","name":"\u0130lk Numune Muayenesi: S\u00fcre\u00e7, Raporlar ve Standartlar","isPartOf":{"@id":"https:\/\/www.cncmachiningshops.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.cncmachiningshops.com\/first-article-inspection\/#primaryimage"},"image":{"@id":"https:\/\/www.cncmachiningshops.com\/first-article-inspection\/#primaryimage"},"thumbnailUrl":"https:\/\/www.cncmachiningshops.com\/wp-content\/uploads\/2026\/04\/First-Article-Inspection-FAI-800x600-1.jpg","datePublished":"2026-04-06T02:00:08+00:00","dateModified":"2026-07-19T03:23:31+00:00","description":"\u0130lk numune muayenesi (FAI) i\u00e7in eksiksiz k\u0131lavuz \u2014 ad\u0131m ad\u0131m s\u00fcreci, AS9102 rapor \u015fablonlar\u0131n\u0131, sekt\u00f6r standartlar\u0131n\u0131 ve FAI'yi ilk denemede nas\u0131l ge\u00e7ece\u011finizi kapsar.","breadcrumb":{"@id":"https:\/\/www.cncmachiningshops.com\/first-article-inspection\/#breadcrumb"},"inLanguage":"tr","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.cncmachiningshops.com\/first-article-inspection\/"]}]},{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/www.cncmachiningshops.com\/first-article-inspection\/#primaryimage","url":"https:\/\/www.cncmachiningshops.com\/wp-content\/uploads\/2026\/04\/First-Article-Inspection-FAI-800x600-1.jpg","contentUrl":"https:\/\/www.cncmachiningshops.com\/wp-content\/uploads\/2026\/04\/First-Article-Inspection-FAI-800x600-1.jpg","width":800,"height":600,"caption":"First Article Inspection (FAI) 800x600"},{"@type":"BreadcrumbList","@id":"https:\/\/www.cncmachiningshops.com\/first-article-inspection\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.cncmachiningshops.com\/"},{"@type":"ListItem","position":2,"name":"First Article Inspection (FAI): Definition, Process, Report Templates, and Industry Standards"}]},{"@type":"WebSite","@id":"https:\/\/www.cncmachiningshops.com\/#website","url":"https:\/\/www.cncmachiningshops.com\/","name":"CNC \u0130\u015fleme At\u00f6lyeleri","description":"10+ Y\u0131l CNC \u0130\u015fleme Hizmeti Tedarik\u00e7isi","publisher":{"@id":"https:\/\/www.cncmachiningshops.com\/#organization"},"alternateName":"CMS","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.cncmachiningshops.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"tr"},{"@type":"Organization","@id":"https:\/\/www.cncmachiningshops.com\/#organization","name":"CNC \u0130\u015fleme At\u00f6lyeleri","alternateName":"CMS","url":"https:\/\/www.cncmachiningshops.com\/","logo":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/www.cncmachiningshops.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.cncmachiningshops.com\/wp-content\/uploads\/2025\/11\/CMS_Logo_1000x1000.png","contentUrl":"https:\/\/www.cncmachiningshops.com\/wp-content\/uploads\/2025\/11\/CMS_Logo_1000x1000.png","width":800,"height":800,"caption":"CNC Machining Shops"},"image":{"@id":"https:\/\/www.cncmachiningshops.com\/#\/schema\/logo\/image\/"},"description":"Shenzhen CMS Technology Co., Ltd. Shenzhen, Guangdong, \u00c7in'de bulunmaktad\u0131r. 2012 y\u0131l\u0131nda 3.000 metrekare fabrika alan\u0131 ile kurulmu\u015ftur. CNC i\u015fleme ve hassas par\u00e7a \u00fcretimi konusunda uzmanla\u015fm\u0131\u015f bir \u015firkettir. ISO9001, IATF16949, ISO13485 sertifikalar\u0131na sahibiz ve g\u00fcvenilir orta\u011f\u0131n\u0131z\u0131z.","email":"info@cncmachiningshops.com","telephone":"+8617196430663","legalName":"Shenzhen CMS Technology Co., Ltd.","foundingDate":"2012-07-22","numberOfEmployees":{"@type":"QuantitativeValue","minValue":"11","maxValue":"50"}},{"@type":"Person","@id":"https:\/\/www.cncmachiningshops.com\/#\/schema\/person\/2593a2e2de68be71300e10f486236551","name":"cncmachiningshops","image":{"@type":"ImageObject","inLanguage":"tr","@id":"https:\/\/secure.gravatar.com\/avatar\/36a63d96ed08f8805561107422de4e83bbf8d1669dbc9655acab534bc3e1ed17?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/36a63d96ed08f8805561107422de4e83bbf8d1669dbc9655acab534bc3e1ed17?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/36a63d96ed08f8805561107422de4e83bbf8d1669dbc9655acab534bc3e1ed17?s=96&d=mm&r=g","caption":"cncmachiningshops"},"sameAs":["https:\/\/cncmachiningshops.com"]}]}},"_links":{"self":[{"href":"https:\/\/www.cncmachiningshops.com\/tr\/wp-json\/wp\/v2\/posts\/10482","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.cncmachiningshops.com\/tr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.cncmachiningshops.com\/tr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.cncmachiningshops.com\/tr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.cncmachiningshops.com\/tr\/wp-json\/wp\/v2\/comments?post=10482"}],"version-history":[{"count":0,"href":"https:\/\/www.cncmachiningshops.com\/tr\/wp-json\/wp\/v2\/posts\/10482\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.cncmachiningshops.com\/tr\/wp-json\/wp\/v2\/media\/12134"}],"wp:attachment":[{"href":"https:\/\/www.cncmachiningshops.com\/tr\/wp-json\/wp\/v2\/media?parent=10482"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.cncmachiningshops.com\/tr\/wp-json\/wp\/v2\/categories?post=10482"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.cncmachiningshops.com\/tr\/wp-json\/wp\/v2\/tags?post=10482"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}